08-09-2014, 02:44 PM
Thanks gents. I must admit the routing assumptions were a boo boo on my part. I can claim that is was a misreading error from hand written notes to the typed version.
Jerry - for your first option - would there be fully signalled moves if no bi-di routes are available? Or is this the case that all Down direction trains would terminate at the preceding stations?
Would it be fair to say that this would be a fail? I'm only asking so that I know how much more information I need to drive into the answers
Jerry - for your first option - would there be fully signalled moves if no bi-di routes are available? Or is this the case that all Down direction trains would terminate at the preceding stations?
Would it be fair to say that this would be a fail? I'm only asking so that I know how much more information I need to drive into the answers

